- Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Fiqry Jaya Manunggal - Training and Consulting Services
Welcome to PT FIQRY JAYA MANUNGGAL (FJM)
Dear Customers,
PT. Fiqry Jaya Manunggal was established in 2001 with variety of services in human resources training. These training programs range from publics to customized in-house training to meet the specific needs of our honored clients. Technical training is our main focus although soft skills, procurement & logistics and other topics are also in our radar.
Over the decade in services, FJM has enlarged the services to consulting services such as architect/fit out, graphic design & printing, and software development. Most of our clients are from oil/gas industries, power generation & mining.
We also serve on providing Health & Safety certification training issued by Kemnaker (Ministry of Human Resources) for both human resources and equipment certification. Such certificate/license has normally 3-years validity where we also serve to take care of such re-certification and extension process.
It is our commitment to provide the best services to Our Clients.
Training Terkini
Maintenance and Reliability Management System
Background Dalam industri modern—terutama migas, pembangkit, petrokimia, dan manufaktur—fungsi maintenance tidak lagi bersifat reaktif, tetapi harus dikelola sebagai sistem manajemen yang terstruktur, berbasis risiko, dan berorientasi keandalan. Maintenance and Reliability Management System (MRMS) merupakan pendekatan terintegrasi yang menghubungkan strategi maintenance, reliability engineering, perencanaan kerja, pengendalian biaya, serta kinerja aset, guna menjamin keberlangsungan operasi, keselamatan, dan profitabilitas…
*Harga Hubungi CS
Petroleum Resources Management System
Background: The Petroleum Resources Management System (PRMS) is an internationally recognized framework used to classify, evaluate, and report petroleum resources and reserves in a consistent and transparent manner. PRMS goes beyond volumetric estimation by integrating technical maturity, commercial viability, risk, and uncertainty into a project-based decision framework. For professionals outside the subsurface discipline, PRMS provides…
*Harga Hubungi CS
Rig and Equipment Selection
Background: Rig and equipment selection is a critical early decision in drilling planning that directly affects safety, operational efficiency, cost, and overall project success. Inappropriate rig selection can lead to operational limitations, excessive non-productive time (NPT), or increased HSE exposure. For example, lack of appropriate knowledge may wrongly select rig rental company during tender evaluation….
Rp 5.950.000
Economics & Commercial Aspects of POD
Background: Plan of Development (POD) of oil & gas fields represents a very complex problem and involves huge amounts of investments. POD is also one of the main business processes in Indonesia PSC besides Work Program & Budget (WP&B) and Authorization for Expenditure (AFE). Understand POD mechanism is very importance for anyone working on oil…
Rp 14.950.000
Produced Water Management
Background: Produced water merupakan fluida dengan volume terbesar yang dihasilkan dalam operasi minyak dan gas. Seiring meningkatnya usia lapangan, rasio produced water terhadap hydrocarbon cenderung meningkat dan menimbulkan tantangan teknis, lingkungan, serta biaya operasi yang signifikan. Dengan demikian Produced Water Management menjadi isu teknis, lingkungan, dan ekonomi yang kritikal. Pengelolaan produced water yang efektif membutuhkan…
Rp 7.950.000
PSC Business & Profit Sharing Funds
Background: Production Sharing Contract (PSC) is the most widely used contractual framework in the oil and gas industry to regulate the relationship between host governments and contractors. Under this scheme, in the upstream oil & gas business Government retains ownership of natural resources, while contractors are entitled to recover costs and share profits according to…
Rp 14.950.000
Supervisi Pengoperasian Sistem BOP (Balance of Plant)
BACKGROUND: Pada pembangkit listrik tenaga uap (PLTU) berbahan bakar batu bara, areanya dikelompokkan menjadi beberapa bagian utama: Main Power Equipment, Balance of Plant (BOP), dan Coal Handling. Secara khusus, Main Power Equipment mencakup boiler, turbin, generator, transformator, dan kondensor. Sementara itu, BOP (Balance of Plant) meliputi beberapa sistem penting seperti Water Treatment Plant (MED, Mixed…
Rp 7.950.000
Engineering Cost Estimate
BACKGROUND: Definisi Cost Engineering menurut AACE (American Association of Cost Engineer) adalah “suatu bidang engineering, yang meliputi penerapan prinsip-prinsip ilmiah dan teknik, dengan menggunakan pengalaman dan pertimbangan engineering dalam masalah estimasi biaya, pengendalian biaya dan ekonomi teknik“. Pada saat cost engineering belum berkembang perhitungan biaya konstruksi selalu mengalami penyimpangan yang cukup besar. Merespon semua kondisi…
Rp 7.950.000
Rotating Equipment Operation & Maintenance
BACKGROUND: Rotating equipment is commonly used in the industry & plays a vital role in end-to-end production operations. Hence, mastering the principles of rotating equipment is very essential. Identification of failure modes & monitoring methods of failure symptoms are important as well, for establishing the most effective maintenance program. This course begins with discussing the…
Rp 7.950.000BFPT Protection and Supervisory System
BFPT (Boiler Feed Pump Turbine) : Protection and Supervisory System Boiler Feed Pump Turbine (BFPT) adalah komponen penting dalam operasi boiler uap, berfungsi untuk memompa air umpan ke dalam boiler. Pompa air umpan ini bekerja dengan mengambil isapan dari sistem pengembalian kondensat dan memompa air bertekanan tinggi, baik berupa air baru maupun kondensat yang dihasilkan…
Rp 6.950.000
Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization
BACKGROUND: Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization are one of the most complex systems among others. It requires team competent in fully integrated approaches starting from initial study, design planning, construction, startup operation and carry on to the post commissioning process. Ideally this includes post start-up review optimization and asset integrity management to…
Rp 7.950.000
BOILER (Pengoperasian Burner System: Coal, Main Oil Gun, Tiny Oil Gun)
BACKGROUND: Pada Pembangkit berbahan bakar batubara, proses start awal boiler tidak bisa langsung menggunakan batubara karena temperatur di furnace masih rendah. Untuk menaikkan temperatur furnace maka digunakan bahan bakar HSD (High Speed Diesel) melalui alat main oil gun. Pada main oil gun terdapat dua saluran utama yaitu saluran bahan bakar HSD dan saluran atomizing air….
Rp 7.950.000
Safety and Risk Management in Oil & Gas
BACKGROUND: Pelatihan ini memberikan pengetahuan dan pemahaman mengenai safety dan manajemen risiko dalam operasi oil & gas. Untuk topik safety management ini akan membahas lapis-lapis perlindungan, safety management system, safety instrumented system (SIS), dan sebagainya. Sedangkan untuk risk management, peserta kursus akan belajar metode-metode penentuan nilai risiko seperti Event Tree Analysis (ETA), Fault Tree Analysis…
Rp 7.950.000
PSC Business & Profit Sharing Funds
Background: Production Sharing Contract (PSC) is the most widely used contractual framework in the oil and gas industry to regulate the relationship between host governments and contractors. Under this scheme, in the upstream oil & gas business Government retains ownership of natural resources, while contractors are entitled to recover costs and share profits according to…
Rp 14.950.000
Produced Water Management
Background: Produced water merupakan fluida dengan volume terbesar yang dihasilkan dalam operasi minyak dan gas. Seiring meningkatnya usia lapangan, rasio produced water terhadap hydrocarbon cenderung meningkat dan menimbulkan tantangan teknis, lingkungan, serta biaya operasi yang signifikan. Dengan demikian Produced Water Management menjadi isu teknis, lingkungan, dan ekonomi yang kritikal. Pengelolaan produced water yang efektif membutuhkan…
Rp 7.950.000
Sistem Kontrol RHVAC
LATAR BELAKANG: Fungsi Refrigeration Heating Ventilating and Air Conditioning (RHAC) adalah untuk mengendalikan kondisi udara di dalam ruang yang ditentukan seperti suhu, kelembaban, kualitas udara, pasokan udara segar dari luar untuk mengendalikan kadar oksigen dan karbon dioksida, dan terakhir, mengendalikan pergerakan udara atau aliran udara. Selama bertahun-tahun, AC telah berubah dari sekadar mendinginkan ruangan menjadi…
Rp 6.950.000
Process Control & Instrument System
Background Control systems play a crucial role in modern industrial processes, ensuring efficiency, accuracy, and stability. The ability to design, analyze, and optimize these systems is essential for maintaining consistent operation and improving performance. This course is designed to equip participants with a strong foundation in control system principles and practices. From understanding core terminology…
Rp 7.950.000
Manajemen Operasi dan Pemeliharaan Pembangkit
BACKGROUND: Manajemen Operasi dan pembangkitan adalah Pemahaman proses operasi sistem pembangkit dan sistem penyaluran secara rasional dan ekonomis dengan memperhatikan mutu dan keandalan. Perawatan Pembangkitan yang dilakukan secara efektif dapat menjadikan perusahaan terdepan dalam bidang pembangkitan Training ini dimaksudkan untuk mempersiapkan Sumber Daya Manusia dalam pengelolaan pengoperasian sistem pembangkit. Selain itu diperlukan untuk meningkatkan pengetahuan…
Rp 7.950.000Training Pilihan
Mungkin Anda sedang mencari training berikut ini, cek aja!
Kategori Pilihan
Sekian banyak kategori produk yang ada pada website kami, berikut ini kategori paling spesial
Our Blog
Kami menghadirkan berbagai artikel menarik dan informatif yang dirancang untuk menambah wawasan Anda. Semoga setiap tulisan yang kami sajikan dapat memberikan manfaat dan inspirasi. Selamat membaca!
Simbol B3 dan Artinya di Industri Migas
Diposting oleh adminDalam industri minyak dan gas (migas), penggunaan bahan kimia merupakan bagian penting dari berbagai proses operasional seperti pengeboran, pemrosesan minyak, hingga pemeliharaan peralatan. Banyak dari bahan tersebut termasuk dalam kategori Bahan Berbahaya dan Beracun (B3) sehingga harus ditangani dengan prosedur keselamatan yang ketat. Untuk memudahkan identifikasi risiko, setiap bahan B3 biasanya dilengkapi dengan simbol bahaya….
SelengkapnyaProduction Sharing Contract Migas di Indonesia
Diposting oleh adminDi Indonesia Production Sharing Contract Migas seluruhnya mulai kegiatan eksplorasi dan produksi sampai dengan sales berada di bawah kendali negara. Hal ini sejalan dengan prinsip bahwa sumber daya alam dikuasai oleh negara untuk sebesar-besarnya kemakmuran rakyat. Untuk mengelola kegiatan tersebut, digunakan mekanisme kerja sama yang dikenal sebagai Production Sharing Contract (PSC), yaitu kontrak antara pemerintah…
SelengkapnyaB3 Adalah: Pengertian Limbah B3 & Pengelolaannya di Industri Migas
Diposting oleh adminIndustri minyak dan gas (migas) merupakan salah satu sektor yang menghasilkan berbagai jenis bahan kimia dan limbah berbahaya. Oleh karena itu, pemahaman mengenai B3 dan pengelolaannya sangat penting untuk menjaga keselamatan kerja, kesehatan manusia, serta kelestarian lingkungan. Lalu sebenarnya B3 adalah apa? Bagaimana cara pengelolaan limbah B3 yang benar di industri migas? Artikel ini akan…
Selengkapnya
>

